detection and fire alarm systems " is a mandatory standard that specifies requirements and laboratory test for every component of fire detection and fire alarm system and it allows the free movement of co
stand-alone solution for the cold water supply. Customised solutions. In predominantly demanding testing areas, our maintenance-free εCOOL air/water heat exchangers and EB series chillers are both cost
example of what a tailored package solution looks like is the Pfannenberg chiller installed in the test lab of PolymerEngineering in Hamburg, Germany. The competence centre PolymerEngineering belongs to [...] underdimensioning. Fig. 2: One of the three cooled injection moulding machines in the PolymerEngineering test lab Without the cooling provided by the Pfannenberg chillers, it basically would not be possible to [...] design and on-time delivery to commissioning, including three-phase power measurements, functional testing and assistance in piping installation. After-sales maintenance is also part of the package. Fig.
most application demands are best served with our off-the-shelf products which have been extensively tested and proven to be efficient and robust. For specialist applications which generate specific requirements [...] Technical Service 24/7 worldwide presence | commissioning, repair and maintenance | F-GAS leakage tests | spare part kits | service trainings | PSS - Pfannenberg Sizing Software We'll find the right solution
to a point B, but also to cool them along the path. Pfannenberg and MB Conveyors have studied and tested together the most appropriate solution. The Customer Since 1985 MB Conveyors designs and manufactures [...] 5302 - Air/water heat exchanger 2150 W Robust steel cover, easily paintable. Water circuit pressure-tested to 30 bar. Surface seal to protect against the penetration of water via the roof surface of the control
powder coated steel cover NEMA 4/4X (DTS 3031 VA) unit with stainless steel cover maintains a UL tested NEMA type 3R/4 or 4/4X seal against the enclosure condenser with 3 mm fin spacing, highly effective [...] y suitable for outdoor applications or for the food and beverage industry. 3 Robust design using tested and energy efficient components. 4 Condenser with large fin spacing enables very long maintenance
a Product Inquiry PSS Sizing Software robust steel cover, easily paintable water circuit pressure-tested to 30 bar surface seal to protect against the penetration of water via the roof surface of the control [...] requires no elaborate reworking of the mounting cut-out. Maintenance-free. 4 Water circuit Pressure-tested to 30 bar. 10 bar maximum operating pressure. 5 Economic System-compatible with chillers. Can be
iciency. The εCOOL series has made an enormous leap in development compared with other tried and tested DTI/DTS units, in particular in energy efficiency. Especially developed components combined with [...] energy consumption by up to 43 %. In stand-by mode by a further 10 %. εCOOL DTI/DTS and DTT. The time-tested, high-quality industrial standard of the DTI/DTS completely covers the needs for side mounting and
food industry and outdoor applications high protection system IP 56, maintenance-free maintains a UL tested NEMA type 3R/4 seal against the enclosure NEMA 3R/4 (DTS 3265) unit with powder coated steel cover [...] y suitable for outdoor applications or for the food and beverage industry. 3 Robust design using tested and energy efficient components. 4 Condenser with large fin spacing enables very long maintenance
and tested concept. For example, the demands on the alternating pressure load with ±10 kPa doubled, which made it necessary to completely rework the mechanics of the cooling units. In a Swibox test laboratory [...] throughout their whole service lives. Fig. 1: Inside View Gotthard Tunnel Pfannenberg and Swibox – a time-tested team. Two long-term partners have joined forces once more for the Gotthard Base Tunnel project: [...] Gotthard Base Tunnel. They have already been able to prove their reliability every day, as the various test phases started a while ago and will continue until the start of the scheduled railway operation on